Scope of Work: Construction of 170-MW hybrid renewables project in Lower Silesian Province.
Description: The hybrid project will be built on an area of about 120 hectares (296.5 acres) in Lower Silesian Province and will consist of up to ten wind turbines of the 7 MW class and a solar park of up to 100 MWp. The combination of wind energy and photovoltaic park will get the maximum yield out of the area. With regard to the 10H distance rule in Poland. Project completion date : 2023-12-31 12:00:00 Major organization : VSB GROUP Address : P.O. Box 32 01 37 01013 Dresden
Country :Germany Email : info@vsb.energy Url : https://www.vsb.energy/