Saturday, June 25 2022 Sign In   |    Register
 

News Quick Search


 

News


Front Page
Power News
Today's News
Yesterday's News
Week of Jun 20
Week of Jun 13
Week of Jun 06
Week of May 30
Week of May 23
By Topic
By News Partner
Gas News
News Customization
Feedback

 

Pro Plus(+)


Add on products to your professional subscription.
  • Energy Archive News
  •  



    Home > News > Power News > News Article

    Share by Email E-mail Printer Friendly Print

    Andhra Pradesh CM to lay foundation for hybrid power project in Kurnool on May 17


    May 16, 2022 - Hindu

     

      Chief Minister Y.S. Jagan Mohan Reddy on Tuesday will lay the foundation for the ?15,000-crore hybrid Pinnapuram solar wind-pumped storage project being developed by the Greenko Group.

      The Chief Minister is scheduled to reach the 5,140-MW project site at Gummitham Tanda near Brahmanapalli in Orvakal mandal at 11.35 a.m. and spend an hour there, said Collector P. Koteswara Rao.

      A Memorandum of Understanding (MoU) was signed for the project between the Greenko and the Andhra Pradesh government in February 2018, after a pre-feasibility study. The detailed design and engineering contract for the pumped-storage component of the project was awarded in March, 2020.

      The Pinnapuram Integrated Renewable Energy Storage Project (IRESP) plans utilisation of water from the Gorakallu reservoir (Narasimharaya Sagar). The upper and lower reservoirs for the Pinnapuram IRESP will be constructed.

      Solar and wind power will be utilised to pump water from the lower reservoir to the upper reservoir during the day time, while water would be released back to lower reservoir to generate hydro power in the night, when other RE sources are not available.

      Such facility to supply scheduled power on demand (SPOD) is first-of-its-kind project in the country and it is designed for both peak load and base load functioning. The hybrid power generation unit can supply up to 7 billion units of electricity a year.

      The live storage of the lower and upper reservoir are likely to be 12.44 tmcft and 1 tmcft respectively. According to the Greenko’s fourth integrated report, it is aiming at achieving a ‘net zero’ by 2040, ten years ahead of the target.

      The officials have made all arrangements for the Chief Minister’s visit both at the thanda and the Orvakal airport, where he will land by a special flight from Gannavaram airport near Vijayawada, the Collector said.

      Superintendent of Police Ch. Sudheer Kumar Reddy and the Collector inspected both the sites and ensured that all security arrangements were in place.

    TOP

    Other Articles - International


    TOP

       Home  -  Feedback  -  Contact Us  -  Safe Sender  -  About Energy Central   
    Copyright © 1996-2022 by CyberTech, Inc. All rights reserved.
    Energy Central® and Energy Central Professional® are registered trademarks of CyberTech, Incorporated. Data and information is provided for informational purposes only, and is not intended for trading purposes. CyberTech does not warrant that the information or services of Energy Central will meet any specific requirements; nor will it be error free or uninterrupted; nor shall CyberTech be liable for any indirect, incidental or consequential damages (including lost data, information or profits) sustained or incurred in connection with the use of, operation of, or inability to use Energy Central. Other terms of use may apply. Membership information is confidential and subject to our privacy agreement.