Saturday, June 25 2022 Sign In   |    Register
 

News Quick Search


 

News


Front Page
Power News
Today's News
Yesterday's News
Week of Jun 20
Week of Jun 13
Week of Jun 06
Week of May 30
Week of May 23
By Topic
By News Partner
Gas News
News Customization
Feedback

 

Pro Plus(+)


Add on products to your professional subscription.
  • Energy Archive News
  •  



    Home > News > Power News > News Article

    Share by Email E-mail Printer Friendly Print

    Greenalia SA - GREENALIA´S 50 MW FONSANTA WIND FARM IN SPAIN NOW IN PUBLIC EXHIBITION PHASE


    May 19, 2022 - Spanish Equity Markets via PUBT

     

      • Fonsanta will developed in the municipalities of Bande and Verea (Ourense, Galicia)
      • The project foreseesover 41 million euros investmentand over 500 jobs mobilized
      • The operating wind farmallows for a 600 tCO2 reduction in atmospheric emissions

      Greenalia continues to develop its project portfolio. 50 MW Fonsanta WF achieves a new milestone today in Bande and Verea Municipalities, in the province of Ourense (Spain) as published in the Official Gazette.

      Fonsanta is composed of 12 wind turbines that will be installed within O Vieiro zone, part of the Galician Wind Sectorial Plan. The project guarantees the environmental protection and technical viability of the project as detailed in the published proposal and the corresponding technical assessments and reports.

      This 50 MW WF will have a production capacity of 153,163 MWh/year, equivalent to the consumption of 43,480 families and generating a reduction of 56,670 tons of CO2 atmospheric emissions.

      The wind turbines have a 4.2 MW unit power, with the exception of one of 3.8 MW, a 112 meters hub height of 112 and a 150 meters rotor diameter. The total investment adds up to 41 million euros and over 650.000 euros will go to local administrations through fees and taxes.

      It will not affect areas protected by the Galician Network of Protected Areas and the Natura 2000 Network. Likewise, the areas included in the Galician Catalogue of Wetlands have also been excluded. Its location is also outside bird protection areas (IBAs).

      In avifauna terms, the study shows that ornithological interest is limited due to the low number located over months. Likewise, no specific migratory corridor has been detected. In any case, to avoid possible collisions that may occur, a series of preventive measures are established. Thus, the possibility of painting a blade in black on each wind turbine is foreseen, an aspect that has been proven to significantly reduce the risk of collision.

      Regarding cultural heritage, the study reflects the compatibility of the installation. As a preventive measure, a clearing is established prior to the constructive and prospecting actions on areas currently covered with weeds and vegetation to verify the possible existence or not of cultural assets, beyond the cartographic analyses. Finally, a package of environmental measures is introduced, including a restoration plan over 13.290 m2.

      Disclaimer

      Greenalia SA published this content on 19 May 2022 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 19 May 2022 14:07:52 UTC.

    TOP

    Other Articles - International


    TOP

       Home  -  Feedback  -  Contact Us  -  Safe Sender  -  About Energy Central   
    Copyright © 1996-2022 by CyberTech, Inc. All rights reserved.
    Energy Central® and Energy Central Professional® are registered trademarks of CyberTech, Incorporated. Data and information is provided for informational purposes only, and is not intended for trading purposes. CyberTech does not warrant that the information or services of Energy Central will meet any specific requirements; nor will it be error free or uninterrupted; nor shall CyberTech be liable for any indirect, incidental or consequential damages (including lost data, information or profits) sustained or incurred in connection with the use of, operation of, or inability to use Energy Central. Other terms of use may apply. Membership information is confidential and subject to our privacy agreement.