Wednesday, August 10 2022 Sign In   |    Register
 

News Quick Search


 

News


Front Page
Power News
Today's News
Yesterday's News
Week of Aug 08
Week of Aug 01
Week of Jul 25
Week of Jul 18
Week of Jul 11
By Topic
By News Partner
Gas News
News Customization
Feedback

 

Pro Plus(+)


Add on products to your professional subscription.
  • Energy Archive News
  •  



    Home > News > Power News > News Article

    Share by Email E-mail Printer Friendly Print

    China : About Guizhou Xinghan Technology Trading Co., Ltd. Coal Washing Plant Construction Project Proposed Approval Announcement


    July 1, 2022 - TendersInfo - News

     

      After the reconstruction and expansion, the project covers an area of ??25,000m2, and the main construction contents are: raw coal storage yard, conveyors, conveying corridors, grading screens, crushers and other coal preparation projects; Coal washing equipment such as separator, filter press concentration and other storage and transportation projects of raw coal, clean coal and gangue; coal blending workshop; office area, weighing room and other auxiliary projects.

      Construction unit

      Guizhou Xinghan Technology Trading Co., Ltd.

      Environmental Impact Assessment Agency

      Guizhou Anshun Environmental Protection Research Institute Co., Ltd.

      Main environmental impacts and countermeasures and measures to prevent or mitigate adverse environmental impacts

      1 Exhaust gas: For automobile exhaust: strictly implement the annual inspection system for automobile exhaust emissions; at the same time, it is recommended to strengthen greening measures around the parking area; for anti-seepage dry toilets and odors from garbage collection points: take timely measures for the odors generated by improved septic tanks and garbage collection points Measures such as flushing, spraying disinfectants, placing deodorants, etc.; for raw coal screening and crushing of unorganized dust: the screening and crushing workshops shall adopt closed production and spray sprinkler devices for dust suppression; for unorganized dust generated in the yard: the project shall Strengthen the moisture content of raw coal, adopt water spraying to reduce dust, adopt fully enclosed closed storage yard and adopt closed corridors during raw coal transportation to reduce the impact of dust on the surrounding environment; for road transportation dust: set up special personnel to sprinkle water on roads to suppress dust, and vehicles are covered. Tarpaulin, while strengthening the surrounding greening.

      2 Wastewater: the greening water of the project is absorbed by vegetation, and no waste water is produced after natural evaporation; the road dust suppression water in the site is naturally evaporated and no waste water is produced. Sewage and unforeseen waste water are collected by anti-seepage dry toilets and reused for agricultural fertilizers in the surrounding dry land. The coal washing wastewater part of the project is taken away by the product and naturally evaporated, and no wastewater is produced. The remaining wastewater is pretreated in a circulating water tank (600m3) and recycled without being discharged. Coal slime water is not discharged; the ground flushing water of the project workshop, vehicle flushing water, initial rainwater and yard leachate, etc. are pretreated by the existing sedimentation tank (42m3) + the newly built sedimentation tank (60m3), and are used as production water supplementary water.

      3 Noise: The project should take vibration and noise reduction measures for the production line equipment to reduce the impact of noise on residential areas; rationally arrange the production line, and try to install high-noise machinery and equipment in the middle of the production line to reduce the impact of noise on the surrounding acoustic environment. At the same time, the wall adopts noise reduction and sound-absorbing materials to reduce noise decibels and reduce the impact of noise on residential areas; and the environmental management of the site should be strengthened. 4 Solid waste; for the living and office waste of project employees: after classified collection, regularly entrust the environmental sanitation department to transport and dispose of it; machinery maintenance waste oil: set up a temporary storage room for hazardous waste (5m2); for sediment in the sedimentation tank: unified collection and clearing After that, it is mixed with coal (China Coal) for sale; the coal gangue generated in the coal washing section of the project is entrusted to Guizhou Fuwei Transportation Co., Ltd. to be transported to Panzhou Ruicheng Building Materials Co., Ltd. as raw materials for the production of gangue bricks , Slime is sold as a secondary product, not discharged.

    TOP

    Other Articles - International


    TOP

       Home  -  Feedback  -  Contact Us  -  Safe Sender  -  About Energy Central   
    Copyright © 1996-2022 by CyberTech, Inc. All rights reserved.
    Energy Central® and Energy Central Professional® are registered trademarks of CyberTech, Incorporated. Data and information is provided for informational purposes only, and is not intended for trading purposes. CyberTech does not warrant that the information or services of Energy Central will meet any specific requirements; nor will it be error free or uninterrupted; nor shall CyberTech be liable for any indirect, incidental or consequential damages (including lost data, information or profits) sustained or incurred in connection with the use of, operation of, or inability to use Energy Central. Other terms of use may apply. Membership information is confidential and subject to our privacy agreement.