Saturday, October 1 2022 Sign In   |    Register
 

News Quick Search


 

News


Front Page
Power News
Today's News
Yesterday's News
Week of Sep 26
Week of Sep 19
Week of Sep 12
Week of Sep 05
Week of Aug 29
By Topic
By News Partner
Gas News
News Customization
Feedback

 

Pro Plus(+)


Add on products to your professional subscription.
  • Energy Archive News
  •  



    Home > News > Power News > News Article

    Share by Email E-mail Printer Friendly Print

    TS Power utilities fully geared up to meet 17,000 MW load in new future: CMD


    August 15, 2022 - United News of India

     

      Hyderabad, Aug. 15 -- TSGENCO and TSTRANSCO Chairman and Managing Director (CMD) D. Prabhakar Rao on Monday stated that the TS Power Utilities are fully geared-up to meet the load up to 17,000 MW in near future. Keeping in view of the rapid growth of Electric Vehicles in the state, power utilities are fully geared up to supply the required bulk power, said Prabhakar after hosting the national flag on the occasion of diamond Jubilee Independence day held at Vidyut Soudha here. As part of the recently declared Telangana Electric Vehicle Policy, a separate consumer category for EV Charging Stations has been created, he said.. The Per-capita consumption of Telangana, which is an index of development of a state, which was 1196 in 2014 has increased to 2012 units at present, he said .the present Per Capita Consumption of Telangana is 73 percent more than National Per Capita Consumption of 1161 Units. Under the visionary leadership of Chief Minister K. Chandrashekar Rao, he said TS Power utilities have met the highest peak demand of 14,160 Megawatts on March 29, 2022 and after formation of the state, an amount of Rs. 36,918 Crores has been invested in strengthening of Transmission and Distribution network in state. For the first time in the history, 24 hours' power is being supplied to 26.90 lakh agriculture pump sets from January 1, 2018 onwards in the state to end the despair of farmers, he said the contracted capacity has been increased from 7,778 MW as on June 2, 2014 to 17,333MW as on Aug 1, 2022 (more than the doubled capacity). The CMD said that the Telangana Power utilities are in forefront in maintaining the Grid Discipline and are taking lead role in scrupulous implementation of Indian Electricity Grid Code (IEGC). In an endeavour to become self-sufficient on power front, TSGENCO commissioned all the four units of Bhadradri Thermal Power Station (4x270MW = 1080MW) and the works at 5x800MW Yadadri Thermal Power Station are expedited., he said TSGENCO has created record by generating an all-time high quantum of hydel power during the FY 2021-22 wherein every hydel station has achieved 100% of the designed generation. On this occasion, CMD said that the Telangana Power Sector has become a Role model in the country and appealed to all employees to rededicate for the betterment of the power sector with ultimate consumer satisfaction as the goal. UNI KNR SHK1832 Published by HT Digital Content Services with permission from United News of India. For any query with respect to this article or any other content requirement, please contact Editor at contentservices@htlive.com

    TOP

    Other Articles - International


    TOP

       Home  -  Feedback  -  Contact Us  -  Safe Sender  -  About Energy Central   
    Copyright © 1996-2022 by CyberTech, Inc. All rights reserved.
    Energy Central® and Energy Central Professional® are registered trademarks of CyberTech, Incorporated. Data and information is provided for informational purposes only, and is not intended for trading purposes. CyberTech does not warrant that the information or services of Energy Central will meet any specific requirements; nor will it be error free or uninterrupted; nor shall CyberTech be liable for any indirect, incidental or consequential damages (including lost data, information or profits) sustained or incurred in connection with the use of, operation of, or inability to use Energy Central. Other terms of use may apply. Membership information is confidential and subject to our privacy agreement.