Friday, December 1 2023 Sign In   |    Register
 

News Quick Search


 

News


Front Page
Power News
Today's News
Yesterday's News
Week of Nov 27
Week of Nov 20
Week of Nov 13
Week of Nov 06
Week of Oct 30
By Topic
By News Partner
Gas News
News Customization
Feedback

 

Pro Plus(+)


Add on products to your professional subscription.
  • Energy Archive News
  •  



    Home > News > Power News > News Article

    Share by Email E-mail Printer Friendly Print

    Aboitiz eyes Ifugao hydro, irrigation venture


    September 20, 2023 - Philippine Daily Inquirer

     

      MANILA -Aboitiz Power Corp. will conduct with the National Irrigation Administration (NIA) a feasibility study on a multipurpose project in Ifugao province that could boost power supply in Luzon while improving food security through irrigation.

      AboitizPower signed a memorandum of understanding (MOU) with the NIA through SN Aboitiz Power Group (SNAP), the company's joint venture with Norwegian renewable power developer Scatec, for the Alimit multipurpose project.

      According to SNAP, this continues an initial feasibility study for the Alimit river that aims 'to look at the water management potential of the project, such as for irrigation.'

      'Through this MOU, NIA and SNAP will be able to jointly cooperate in studying the feasibility of the Alimit multipurpose dam for irrigation, flood reduction in the province of Cagayan, generation of additional power for the Luzon grid and additional benefits for agriculture, aquaculture and general industry development,' said Eduardo Guillen, NIA acting administrator.

      Alimit river is a tributary of the Magat dam, which is owned and operated by NIA and is a major source of irrigation and power in the country's largest island group.

      SNAP currently operates four facilities in three provinces in Luzon. These include the 105-megawatt (MW) Ambuklao hydroelectric power plant that runs along the upper portion of Agno river and the 140-MW Binga hydroelectric facility, both in Benguet province.

      SNAP won the bid for the Ambuklao-Binga hydroelectric power complex for $325 million in 2007.

      In Isabela province, SNAP operates the 8.5-MW Maris hydroelectric power plant that utilizes water coming from the Magat river.

      Meanwhile, the 388-MW Magat hydroelectric power plant that SNAP has been operating since 2007 after it won competitive bidding is located in Ifugao.

      In 2022, SNAP broke ground for the 24-MW Magat battery energy storage system project located at the Magat hydropower complex. Commercial operation of this facility is expected to begin in the first half of 2024. INQ

    TOP

    Other Articles - International


    TOP

       Home  -  Feedback  -  Contact Us  -  Safe Sender  -  About Energy Central   
    Copyright © 1996-2023 by CyberTech, Inc. All rights reserved.
    Energy Central® and Energy Central Professional® are registered trademarks of CyberTech, Incorporated. Data and information is provided for informational purposes only, and is not intended for trading purposes. CyberTech does not warrant that the information or services of Energy Central will meet any specific requirements; nor will it be error free or uninterrupted; nor shall CyberTech be liable for any indirect, incidental or consequential damages (including lost data, information or profits) sustained or incurred in connection with the use of, operation of, or inability to use Energy Central. Other terms of use may apply. Membership information is confidential and subject to our privacy agreement.