Saturday, December 2 2023 Sign In   |    Register
 

News Quick Search


 

News


Front Page
Power News
Today's News
Yesterday's News
Week of Nov 27
Week of Nov 20
Week of Nov 13
Week of Nov 06
Week of Oct 30
By Topic
By News Partner
Gas News
News Customization
Feedback

 

Pro Plus(+)


Add on products to your professional subscription.
  • Energy Archive News
  •  



    Home > News > Power News > News Article

    Share by Email E-mail Printer Friendly Print

    Iberdrola’s capacity in Greece rises to over 420 MW as Askio II and Rokani wind farms are fully commissioned


    September 27, 2023 - Contify Energy News

     

      Iberdrola has commissioned the 37.8-megawatt (MW) Askio II wind farm in Greece. Located in the provinces of Kozani and Eordaia, in the West Macedonia region of Greece, it joins the 50.4 MW Askio III project in full operation, which was completed in 2022. Askio II consists of nine Vestas V150 wind turbines, each with a 4.2 MW capacity, a hub height of 105 metres and a rotor diameter of 150 metres. Both Askio projects are connected to the same grid point, with a combined annual production of around 180GWh anticipated.

      Original Press Release:

      Sept. 26 -- Iberdrola, S.A. issued the following news release:

      - The 37.8-MW Askio II project joins the 50.4-MW Askio III wind farm, commissioned last year, in full operation. Total investment in both projects is close to € 100 million.

      - 18-MW Rokani wind farm has also been commissioned. Equipped with 3 Vestas V162 turbines of 6MW individual capacity, the facility has the 3 largest and most powerful wind turbines in operation in Greece.

      - These projects bring Iberdrola’s total renewables capacity in Greece to over 420 megawatts (MW).



      Iberdrola has commissioned the 37.8-megawatt (MW) Askio II wind farm in Greece. Located in the provinces of Kozani and Eordaia, in the West Macedonia region of Greece, it joins the 50.4 MW Askio III project in full operation, which was completed in 2022. Total investment in both projects was close to € 100 million.

      Askio II consists of nine Vestas V150 wind turbines, each with a 4.2 MW capacity, a hub height of 105 metres and a rotor diameter of 150 metres.

      Both Askio projects are connected to the same grid point, with a combined annual production of around 180GWh anticipated.

      In parallel, the company has also commissioned 18-MW Rokani wind farm located in the Viotia region, Central Greece. The facility is equipped with 3 Vestas V162 turbines of 6 MW unit capacity, the largest and most powerful wind turbines in operation in Greece, with 205 metres hub height.

      Supporting the energy transition in Greece

      Through technological innovation and greater efficiency, the company is committed to develop competitive renewable energy, which is essential to advance in the energy transition towards a decarbonised model and combat climate change.

      Completion of the projects means that Iberdrola now has 421 MW of operational renewable energy capacity in Greece. The company has been present in the country since 2007, and now operates wind and solar projects in the regions of Central Greece, Crete, Thrace, Western Macedonia, Thessaly, Peloponnese and Dodecanese.

      Both Askio projects have made significant financial contributions to local communities, with €2.2 million invested in new infrastructure, supporting local businesses. During the construction and operational phases of the wind farms Iberdrola has created 282 direct and indirect jobs, supporting local supply chains.

      Askio Mountain Range construction challenges

      The Askio projects have been built in a mountainous region at an altitude of 1,500 metres above sea level. In order to navigate the narrow and steep roads, blade lifter technology was required. This involves a specialist trailer which can rotate and vertically tilt the blades during transport, ensuring the components could be moved along existing narrow roads, and avoiding the need for any additional construction work.

      Source: Iberdrola, S.A.

      [Category: Energy, Renewable Energy, Business Expansion]

    TOP

    Other Articles - International


    TOP

       Home  -  Feedback  -  Contact Us  -  Safe Sender  -  About Energy Central   
    Copyright © 1996-2023 by CyberTech, Inc. All rights reserved.
    Energy Central® and Energy Central Professional® are registered trademarks of CyberTech, Incorporated. Data and information is provided for informational purposes only, and is not intended for trading purposes. CyberTech does not warrant that the information or services of Energy Central will meet any specific requirements; nor will it be error free or uninterrupted; nor shall CyberTech be liable for any indirect, incidental or consequential damages (including lost data, information or profits) sustained or incurred in connection with the use of, operation of, or inability to use Energy Central. Other terms of use may apply. Membership information is confidential and subject to our privacy agreement.